SCDMH Charleston Chiller Replacement
Status
Bidding Closed
Prebid Date | 2/12/19 10:00am |
Bid Date | 2/28/19 2:00pm |
Company & Contacts
Location
Charleston, SC
Your are invited to bid on the SCDMH Charleston Mental Health Chiller Replacement project. Bidding documents will be sent as soon as a non-refundable payment of $54.90 (cash,credit card,check) is received by TPM 1241 Assembly St., Columbia, SC 29201 (P.803-252-4770 F.256-0671).
Project Number: J12-9672-ML
Description of Project: This project will replace the existing chiller one for one with a new chiller and controls. A recent feasibility study recommended that the chiller should be replaced with a unit with seacoast coating for extended life. The unit supplies chilled water to the SCDMH Charleston Mental Health Center located in Charleston. The building was built in 2002 and has a total of 32,238 sq.feet.
Construction Cost Range: $130,000 – $170,000